20121030

Bathroom Remodel Part 2

Because not all of you are on Facebook and saw the rest of the bathroom remodel, here ya go!

 We ended up taking out all of the drywall around the shower/tub area to replace it with mold resistant drywall.
 The tub in. It was hard to get in there because it was such a tight fit!
 Drywall patched and you can see the subfloor. The tub is on a raised platform to be able to move the plumbing/drain pipe.
 Painting. I've always loved a blue bathroom!
 This floor is floating vinyl. It is water resistant and perfect for a bathroom in a manufactured home.
 Yay! A toilet!
New vanity in place but not connected.
My next post will cover the tub surround and finishing.

No comments:

Related Posts Plugin for WordPress, Blogger...